The D10 Building was constructed by Sir Owen Williams as a fully integrated pharmaceutical production facility. It was designed as an entirely functional building to house the equipment and processes necessary for the production of liquid and paste products. By the time D10 was ...
Read more

Project details

Title:Sir Owen Williams D10 Building, Nottingham
Entr. year: 1995
Result:Medal
Country: United Kingdom
Town: Nottingham
Category type: architectural heritage
Building type/ Project type: industrial heritage
Former use:Factory
Actual use:Laboratories, office building
Built: 20th century
Architect / Proj.leader: AMEC Design and Management LTD - Mr. J. Sosna , AMEC Design and Management LTD (Stratford upon Avon - GB)
The Jury's citation: "For the superb restoration of one of the most important British buildings of the 'Modern Movement'. The work has been achieved with the greatest respect and sensitivity, allowing the building to accommodate the latest technology associated with laboratories and modern offices"

Description:
The D10 Building was constructed by Sir Owen Williams as a fully integrated pharmaceutical production facility. It was designed as an entirely functional building to house the equipment and processes necessary for the production of liquid and paste products. By the time D10 was officially opened on 27th July 1933, the new building had also made an impression amongst contemporary architects and engineers. The project has involved refurbishing and redeveloping five floors at the front end of the building. This includes a new fenestration system and roof covering, provision of 3.200 m2 of laboratories on the ground floor, 5.500 m2 of offices on the three remaining floors, a major plant room in the basement and including the introduction of modern data and communication systems, fire prevention, safety systems and extensive new services. The existing fenestration at the front of the building has been replaced with a system that is a copy of the original Crittall steel framed 1930's system. The geometry of the new system is almost identical to the original, with rough cast top and bottom glazed panels and steel framing colored in the original green color. Internal vertical blinds have been carefully selected and installed. Some 5.500 m2 of predominantly open plan offices were constructed on three floors with groupings of closed offices and meeting rooms around the refurbished atrium circulation space